Bay Compute animated data-center illustration

How the connected facility operates

When compute demand rises, racks draw more power and release more heat. Cooling draws from the same electrical supply. Bay Compute evaluates these effects together to find adjustments that fit the site’s power budget, thermal limits and service commitments.

Meridian facility view showing a GPU cluster, chillers, air handlers, pumps and electrical systems.
Meridian Command CenterView full size
What we measure
Server power draw and rack-level demand
What we can control
Adjust permitted server power caps as electrical and thermal headroom changes.
What stays within limits
Workload performance targets and service-level agreements

From prediction to control

A digital twin calibrated with site telemetry predicts how each permitted adjustment affects the facility. Bay Compute’s optimizer compares combinations against the operator’s objective and reserves a margin for uncertainty.

Operators can review recommendations or authorize specific controls. After an adjustment, measured power and temperature feed back into the next decision. The control loop can operate without access to tenant workload content.

Where the power goes
Psite = PIT + Pcooling + Pother

Cooling and other facility loads share the site power budget with IT. Changing one changes the headroom available to the others.

How the site limit is protected
Pforecast + Pmargin ≤ Plimit

The optimizer evaluates actions against forecast demand plus an uncertainty allowance. Operators set the operating limit.

Control in your environment

Start with an offline analysis of your data in about one week. No production access is needed for this first phase. Your team then chooses the deployment environment and the controls to enable.

How deployment works
Analyze existing data

Build a site model from existing telemetry. For new builds, start with the Compass design.

Start in recommendation mode

Connect alongside your BMS and DCIM, on-site or in our secure cloud. Review recommendations before enabling controls.

Coordinate within your limits

Authorize specific adjustments. Bay Compute coordinates power, cooling and compute within the limits your operators set.

What it reads

Facility power, UPS and switchgear state; chiller, CDU and air-handler temperatures and flow; and rack-level PDU power.

Facility optimization does not require tenant workload content or new hardware. Authorized access to compute telemetry and controls can reveal additional capacity.

On-site deployment

Run inside your network, under your access policies. Telemetry and control traffic stay within the facility environment.

Secure cloud deployment

Run in a dedicated customer environment with private connectivity, role-based access and logging. Data is encrypted in transit and at rest.

Bay Compute products

For colocation operators, cloud providers and teams managing a facility, a GPU fleet or a portfolio.

Coordinate the whole facility
Evaluate cooling plant, batteries and permitted IT controls together to identify usable capacity within the same utility limit.
Stay ahead of equipment drift
Flag equipment moving outside operating limits so operators can investigate early.
Keep operators in control
Start in recommendation mode. Enable specific controls within the power, thermal and service limits your team sets, across one site or a portfolio.
Explore the colocation operations study →
Facility and compute operations
Site power optimization
Site savings identified
1.31 MW
Potential reduction
6.4%
Baseline work retained
100%
Savings identified by plan20.30 MW baseline
Meridian product preview
Meridian One · Site power optimizationRecorded-data replay
Meridian One compares power available under facility controls, work-preserving compute controls and an operator-approved tradeoff.

For developers and engineering teams sizing a new data center or expanding an existing site.

Start with your utility power
Set utility capacity, target IT load and a capital budget. Compare how much IT capacity each design can support within those constraints.
Compare cooling designs
Evaluate air-cooled, liquid and direct-to-chip options against the same power and thermal limits. Compare plant sizing, energy use and financial returns.
Carry the model into operations
Define telemetry and control points early. Use the selected design as a basis for Meridian commissioning, with operating limits agreed by your team.
Explore the facility planning study →
Compass design studyHow much IT fits on 10 MW?

10 MW utility connection · 7 MW design IT load

Maximum IT load
7.34 MW
Cooling power at 7 MW IT
1.67 MW
Site draw at design load8.88 / 10 MW
ITCoolingOther loads

First limit · Cooling plantCooling capacity sets the ceiling before the utility feed is fully used.

View the Compass planning workspaceCompass planning workspace with IT halls, cooling plant, electrical supply and storage.

Equipment in the Compass catalog

Cooling
  • Trane
  • Vertiv
Battery
  • Sungrow
  • Schneider Electric
Power
  • Schneider Electric
  • Vertiv
Compute
  • NVIDIA
  • AMD

For owners, operators and acquisition teams prioritizing existing sites or evaluating a facility before purchase.

Screen before you commit
Use high-level facility power, IT and cooling demand, setpoints and utilization to identify the sites worth a closer look.
Rank recoverable capacity
Use detailed telemetry to size the opportunity at shortlisted sites. Compare baseline and optimized scenarios within each site's power and thermal limits.
Move from diligence to operations
Prioritize capital by the capacity each site could recover. Carry the model into Meridian when you are ready to operate.
Explore the colocation assessment →
Asian Colocation assessment
~15% potential non-IT power reduction
Baseline 100
Optimized ~85

500+ kW of sellable capacity identified at peak in the facility assessment.

Schedule a 30-minute demo

Schedule a 30-minute demo

Explore what Bay Compute could unlock for your facility.